In July 2005, Our advantageous products MSS SP-75 WPHY 52 flanges were applied to the project of PY30-1 of COOEC.This has saved our customer COOEC a large sum of air freight cost caused by the late delivery of their oversea vendors.
In May 2005,we won the tender for ELBOW and BARRED TEE in the CPPMEC Sudan Project,those are our advantageous products in accordance with MSS SP-75 WPHY 65.
In Mar,2005, we bought the Impact Testing Machine from Wuzhong Material Tester Co.Ltd. The machine was fabricated adhering to the American standard, and it has passed the proof-test of the National Technical Authority, and it is in operation now.
In Mar 2005, the pipe fittings made of WPHY60 and flanges made of ASTM A350 LF2 have been successfully supplied to Langfang Piping Bureau and used in the Kazakhstan Piping Project Of Oil. They are both our major products.